Asalamualaikum everyone, here are the recent updates on construction:

  • Window installation has been completed

  • Electrical rough-ins are 50% completed

  • The plumbing rough-ins are currently being installed

  • PECO transformer has been installed

  • Stucco install is currently ongoing

  • Rooftop drains have been installed and are currently being connected