7/19 Update

Asalamualaikum everyone, here are the current updates on the masjid construction:

  • HVAC ductwork is complete

  • Fire sprinkler line connection is complete

  • Interior install is still ongoing

  • Exterior trench drain install still being designed

  • Fire alarm system currently being installed

  • PECO Gas line is complete, and Verizon FIOS Line is almost fully connected