6/22 Update

Asalamualaikum everyone,

here are some recent updated on the masjid construction

• The Elevator is currently being installed

• We are working on finishing up the HVAC installation in the main prayer hall

• Re-design of the of the exterior draining currently undergoing

• All interior gas pipes have been installed.

• Waiting for PECO to install the meter and exterior line